Many multiplex lots meet every standard. Some are a few centimetres short on a setback or a little over on coverage. A well-prepared minor variance application turns those into approvals — and when the design and the application are planned together, they work.

What the Committee of Adjustment does

The Committee of Adjustment is the local tribunal that decides minor-variance and consent (severance) applications. A minor variance allows a small departure from a zoning standard — a setback, height, coverage or building depth — where the Planning Act’s tests are met.

The four tests

  • The variance maintains the general intent and purpose of the Official Plan.
  • It maintains the general intent and purpose of the zoning by-law.
  • It is desirable for the appropriate development or use of the land.
  • It is minor in nature.

When you might need one

  • A lot that is narrower or shallower than the standards assume.
  • A layout that needs slightly more height, depth or coverage to work well.
  • Projects that go beyond as-of-right unit counts (for example, more than six units).
  • Severances — dividing a lot, which is a consent application.

Why strategy comes before drawings

Discovering that you need a variance after drawings are finished costs months. We test every standard during feasibility, then choose deliberately: redesign to comply, or design with a small number of defensible variances. Requests that are small, well supported and respectful of neighbours are routine; large requests dressed up as minor are not.

How we manage the process

  • Identify the variances and test them against the four tests.
  • Prepare the application, drawings and supporting material.
  • Handle the notice, neighbour questions and the hearing.
  • Track the appeal period after a decision (appeals to the Ontario Land Tribunal are generally due within 20 days).
  • Fold the approved variances into the permit drawings and keep the build on schedule.

One team from first look to first tenant

01
Find & due diligence
02
Plan & design
03
Permits & variances
04
Build
05
Lease & manage

Frequently asked questions

How long does a Committee of Adjustment application take?

From submission to a decision it is commonly a matter of a few months, with an appeal period afterwards. We build realistic timing into your schedule during feasibility.

Can I avoid the Committee of Adjustment?

Often. If the design meets the base zone’s standards, no variance is needed. We test this in feasibility and, where practical, design to comply.

Is a severance the same as a minor variance?

No. A severance (consent) divides a lot; a minor variance changes a zoning standard. Both are decided by the Committee of Adjustment, and some projects need both.

Do multiplexes still need variances now that they are as-of-right?

Many do not, but individual lots can still fall short on a standard. The as-of-right permission removes the need to rezone for the use; it does not waive the zone’s standards.

Can you help with a project that needs a rezoning?

Yes. For projects that go beyond what variances can achieve, we assess the rezoning route and its timeline as part of feasibility.

Related services

Feasibility & due diligenceOptimize your plans10-plex & 20+ unit rentalsMultiplex builderToronto multiplex guideInsights

Find out what your property could become.

Free, no-obligation feasibility call. We look at your lot or your goals and tell you honestly what the numbers say.

Book a free feasibility call