Since 2025 Toronto allows five- and six-unit detached buildings as-of-right in nine designated wards. More units are not automatically more profit. We design and build sixplexes where the economics work, and tell you plainly where they don’t.
Five- and six-unit buildings are permitted as-of-right in nine wards: Parkdale–High Park (4), Davenport (9), Spadina–Fort York (10), University–Rosedale (11), Toronto–St. Paul’s (12), Toronto Centre (13), Toronto–Danforth (14), Beaches–East York (19) and Scarborough North (23, a suburban pilot). Elsewhere, five or six units need a planning application. The City has studied wider permissions, so the map may change — we verify your address against the current rules.
A sixplex works where land cost per unit is modest, the lot comfortably fits the envelope, rents support smaller units near transit, and the project is built efficiently. In those cases the extra two units can lift yield and value meaningfully. We run fourplex, fourplex-plus-suite and sixplex side by side so you choose the option with the best return, not the most units.
Five units can reach a sweet spot on lots that struggle to fit six: more income than a fourplex without the full cost of a sixplex layout. It is also a good fit when a design with five generously sized units rents better than six compressed ones.
Wards 4, 9, 10, 11, 12, 13, 14, 19 and 23. Outside them, five or six units require a planning application. We verify the current rule for your exact address.
Construction commonly sits in the same per-square-foot range as other new multiplex work — roughly $325–$425 — but a six-unit building has more finished area, more kitchens and baths, and more code-driven cost. We provide a property-specific estimate with soft costs.
Generally not under current rules. A fourplex or smaller can often be combined with a garden or laneway suite where the lot qualifies. We confirm against the current bylaw.
Toronto has waived development charges on the second to sixth unit of compliant multiplex projects of up to six units on one lot. Programs evolve, so we confirm the current position for your project.
Sometimes, not always. It depends on land cost, achievable rents, construction and financing costs. We model both so the decision rests on yield and risk, not unit count.
Free, no-obligation feasibility call. We look at your lot or your goals and tell you honestly what the numbers say.