In June 2025 Toronto City Council voted to permit five- and six-unit buildings as-of-right in nine wards. It sounds like an easy win: two more rents on the same lot. In practice, developers and panels have been candid that sixplexes are harder to make pay than they look. Here’s how to think about it.
Where sixplexes are permitted
The nine wards are Parkdale–High Park (4), Davenport (9), Spadina–Fort York (10), University–Rosedale (11), Toronto–St. Paul’s (12), Toronto Centre (13), Toronto–Danforth (14), Beaches–East York (19) and Scarborough North (23). Outside these wards a five- or six-unit building needs a planning application. The wider rules are still being discussed, so confirm your address.
Why the extra two units cost more than two units
- The envelope doesn’t grow. Six good units must fit the same height, setbacks and depth as four, so each unit is smaller or the design is tighter.
- The Building Code steps up with unit count — fire separation, exits, sound and servicing.
- Financing typically moves from residential to commercial or CMHC-insured lending above four units.
- The building can’t currently be combined with a garden or laneway suite, which a fourplex often can.
- More kitchens and bathrooms means more cost per square foot of finished space.
What industry voices have said
At a January 2026 Urban Land Institute Toronto panel on sixplexes, speakers described them as carrying more risk and being harder to develop than a purpose-built rental building, with one developer saying that in their experience it was not working. That doesn’t mean no sixplex works — it means the margin is thinner and the site and design have to be right.
When a sixplex does make sense
- Land cost per unit is modest, so the extra units are not paying for expensive land twice.
- The lot is wide and deep enough that six units don’t feel compressed.
- Rents near transit support smaller units.
- The building is designed and built efficiently, with repeating layouts and simple structure.
- The numbers beat the alternatives — a fourplex, or a fourplex plus a garden suite — after financing costs.
Our approach
We model four units, four-plus-suite, five and six side by side for your lot, with real construction, financing and rent assumptions, and recommend the option with the best return — not the most units.
Sources include City of Toronto planning materials and press coverage of the June 2025 Council decision and the January 2026 ULI Toronto sixplex panel. Rules and market conditions change; confirm current information for your site.